Cannot be installed together with shunt outlet

Cannot be installed together with shunt release

Cannot be installed together with shunt release

Ne peut pas être installé en même temps que le déclencheur à émission de courant.

For EB2 and ED2, cannot be installed together with undervoltage release.

For EB2 and ED2, cannot be installed together with undervoltage release.

Pour EB2 et ED2, ne peut pas être installé en même temps que le déclenchement à minimum de tension.

For EB2 and ED2, cannot be installed together with undervoltage release.

Voltage range 85%-110%. Load current on actuation depending on the applied voltage at 3.5-7 A. As the motorised drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off switching operations to ensure safe operation.

Voltage range 85%-110%. Load current on actuation depending on the applied voltage at 3.5-7 A. As the motor drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off switching operations to ensure safe operation.

Voltage range 85%-110%. Load current on actuation 3.5-7A depending on the applied voltage. As the motorised drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off cycles to ensure safe operation.

Voltage range 85%-110%. Load current during operation depending on the applied voltage at 3.5-7A. As the motorised drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off cycles to ensure safe operation.

Voltage range 85%-110%. Load current on actuation depending on the applied voltage at 3.5-7 A. As the motorised drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off switching operations to ensure safe operation.

Voltage range 85%-110%. Load current on actuation depending on the applied voltage at 3.5-7 A. As the motorised drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off switching operations to ensure safe operation.

Voltage range 85%-110%. Load current on actuation depending on the applied voltage at 3.5-7 A. As the motorised drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off switching operations to ensure safe operation.

Voltage range 85%-110%. Load current on actuation depending on the applied voltage at 3.5-7 A. As the motor drive is designed for a short-term load, it must cool down for at least 15 minutes after 10 consecutive on/off switching operations to ensure safe operation.

For all EB2 sizes. I = 3A with resistive load with 24VCD/240VAC.

For all EB2 sizes. I = 4A with resistive load at 240VAC and 6A at 24VDC.

For all EB2 sizes. I = 4A with resistive load at 240VAC and 6A at 24VDC.

For all EB2 sizes. I = 3A with resistive load with 24VCD/240VAC.

For all EB2 sizes. I = 4A at resistive load with 240VAC and 6A at 24VDC.

For all EB2 sizes. I = 4A with resistive load at 240VAC and 6A at 24VDC.

Mounting from above only.

Two-part design for top and bottom.

Mounting from above only.

Two-part design for top and bottom.

Mounting from above only.

Mounting from above only.

Two-part design for top and bottom.

Mounting from above only.

Two-part design for top and bottom.